Construction Management

Manila North Harbor Modernization Projects

Year: 2010 - 2017

Client: Manila North Harbor, Inc. / Philippine Ports Authority (PPA)

Location: Manila North Harbor, Manila City, Metro Manila

Scope of Work: Engineering design and construction management

PIER 4 EXTENSION & WHARF IMPROVEMENT

Construction of new wharf and bulkhead to accommodate deeper berth consisting mainly of driving new steel sheet piles located further from existing wharf line. The project also extended the length of the pier by 55.4m.

PIER 16 MSW (MARINE SLIPWAY) DECK RETROFITTING

Retrofitting of existing MSW deck, including fit-out for new quay cranes.

REHABILITATION OF EXISTING CONTAINER YARD AT PIER 16 AND MSW (MARINE SLIPWAY) TERMINALS

Rehabilitation of container yard which includes paving works and fit-out for rubber-tyred gantries. The project includes water and drainage systems.

PIER 14 TO 16 WHARF EXTENSION, SLIP 15 RECLAMATION AND CY EXPANSION

Mainly consists of the reclamation of Slip 15 which is the area between Pier 14 and 16 and conversion of reclaimed area to container yard.

North Passenger Terminal Building and Concourse Building

Year: 2012 - 2013

Client: Manila North Harbor, Inc.

Location: Manila North Harbor, Manila City, Metro Manila

Scope of Work: Engineering design and construction management

Construction of passenger terminal building – 3000m²

Concourse structure across the terminal building including private and shuttle bus parking

Philippine Ports Authority (PPA) Head Office Building

Year: 2006 - 2007

Client: Philippine Ports Authority (PPA)

Location: Bonifacio Drive, Port Area, Manila City

Scope of Work: Third-party quality assurance

7-storey office building

Nation Granary Pier Facilities and Conveyer Supports

Year: 2003 - 2006

Client: Nation Granary, Inc.

Location: Sariaya, Quezon Province

Scope of Work: Construction management

270-m long causeway

650-m long access trestle

240-m long pier

4 mooring dolphins

Design vessel: 120,000 tons DWT, including conveyor and unloader supports

EVA Macapagal Super Terminal

Year: 2002

Client: Philippine Ports Authority (PPA)

Location: Manila North Harbor, Manila City, Metro Manila

Scope of Work: Third-party quality assurance

Passenger terminal building – 2,930m²

Manila South Harbor Rehabilitation

Year: 2000 -2009

Client: Asian Terminals, Inc. / Philippine Ports Authority (PPA)

Location: South Harbor Port Area, Manila City, Metro Manila

Scope of Work: Evaluation, retrofitting design, and construction management

PIER 3, 5, 9 AND 15 REHABILITATION

Third-party quality assurance; structural investigation, preparation of retrofitting plans, and supervision of retrofitting activities conducted by F. F. Cruz & Co. Inc. Retrofitting works include pile concrete encapsulation, beam encasement, and slab replacement.

EXPANSION OF CONTAINER YARD (NIA & DPWH AREA)

Third-party quality assurance; paving works for container stacking, lanes for rubber-tired, gantries and reach stackers, reefer gantries, drainage, and electrical works; supervising construction activities conducted by F. F. Cruz & Co., Inc.

Atrium Hotel and Supermarket

Year: 1996

Client: QHP Realty Corporation

Location: Iloilo City

Scope of Work: Construction management

5-storey commercial building

Ground floor – supermarket area

2nd to 3rd floor – commercial areas

4th to 5th floor – hotel

La Salle High School Building

Year: 1994

Client: La Salle Greenhills

Location: Greenhills, San Juan, Metro Manila

Scope of Work: Construction management

Four-storey high school building

Manila Luxury Condominium

Year: 1989 - 1990

Client: c/o Gov. Ynarez

Location: Pearl Drive Ave, Mandaluyong City, Metro Manila

Scope of Work: Construction management

18-storey high-rise condominium with 2 basements and swimming pool

Gold Loop Twin Towers

Year: 1988 - 1990

Client: Gold Loop Realty

Location: Gold Loop St., Mandaluyong City, Metro Manila

Scope of Work: Construction management

20-storey twin tower condominium with 2 basements and a swimming pool at 4th-floor podium