
Construction Management
Manila North Harbor Modernization Projects
Year: 2010 - 2017
Client: Manila North Harbor, Inc. / Philippine Ports Authority (PPA)
Location: Manila North Harbor, Manila City, Metro Manila
Scope of Work: Engineering design and construction management
PIER 4 EXTENSION & WHARF IMPROVEMENT
Construction of new wharf and bulkhead to accommodate deeper berth consisting mainly of driving new steel sheet piles located further from existing wharf line. The project also extended the length of the pier by 55.4m.
PIER 16 MSW (MARINE SLIPWAY) DECK RETROFITTING
Retrofitting of existing MSW deck, including fit-out for new quay cranes.
REHABILITATION OF EXISTING CONTAINER YARD AT PIER 16 AND MSW (MARINE SLIPWAY) TERMINALS
Rehabilitation of container yard which includes paving works and fit-out for rubber-tyred gantries. The project includes water and drainage systems.
PIER 14 TO 16 WHARF EXTENSION, SLIP 15 RECLAMATION AND CY EXPANSION
Mainly consists of the reclamation of Slip 15 which is the area between Pier 14 and 16 and conversion of reclaimed area to container yard.










North Passenger Terminal Building and Concourse Building
Year: 2012 - 2013
Client: Manila North Harbor, Inc.
Location: Manila North Harbor, Manila City, Metro Manila
Scope of Work: Engineering design and construction management
Construction of passenger terminal building – 3000m²
Concourse structure across the terminal building including private and shuttle bus parking




Philippine Ports Authority (PPA) Head Office Building
Year: 2006 - 2007
Client: Philippine Ports Authority (PPA)
Location: Bonifacio Drive, Port Area, Manila City
Scope of Work: Third-party quality assurance
7-storey office building


Nation Granary Pier Facilities and Conveyer Supports
Year: 2003 - 2006
Client: Nation Granary, Inc.
Location: Sariaya, Quezon Province
Scope of Work: Construction management
270-m long causeway
650-m long access trestle
240-m long pier
4 mooring dolphins
Design vessel: 120,000 tons DWT, including conveyor and unloader supports


EVA Macapagal Super Terminal
Year: 2002
Client: Philippine Ports Authority (PPA)
Location: Manila North Harbor, Manila City, Metro Manila
Scope of Work: Third-party quality assurance
Passenger terminal building – 2,930m²


Manila South Harbor Rehabilitation
Year: 2000 -2009
Client: Asian Terminals, Inc. / Philippine Ports Authority (PPA)
Location: South Harbor Port Area, Manila City, Metro Manila
Scope of Work: Evaluation, retrofitting design, and construction management
PIER 3, 5, 9 AND 15 REHABILITATION
Third-party quality assurance; structural investigation, preparation of retrofitting plans, and supervision of retrofitting activities conducted by F. F. Cruz & Co. Inc. Retrofitting works include pile concrete encapsulation, beam encasement, and slab replacement.
EXPANSION OF CONTAINER YARD (NIA & DPWH AREA)
Third-party quality assurance; paving works for container stacking, lanes for rubber-tired, gantries and reach stackers, reefer gantries, drainage, and electrical works; supervising construction activities conducted by F. F. Cruz & Co., Inc.


Atrium Hotel and Supermarket
Year: 1996
Client: QHP Realty Corporation
Location: Iloilo City
Scope of Work: Construction management
5-storey commercial building
Ground floor – supermarket area
2nd to 3rd floor – commercial areas
4th to 5th floor – hotel


La Salle High School Building
Year: 1994
Client: La Salle Greenhills
Location: Greenhills, San Juan, Metro Manila
Scope of Work: Construction management
Four-storey high school building


Manila Luxury Condominium
Year: 1989 - 1990
Client: c/o Gov. Ynarez
Location: Pearl Drive Ave, Mandaluyong City, Metro Manila
Scope of Work: Construction management
18-storey high-rise condominium with 2 basements and swimming pool


Gold Loop Twin Towers
Year: 1988 - 1990
Client: Gold Loop Realty
Location: Gold Loop St., Mandaluyong City, Metro Manila
Scope of Work: Construction management
20-storey twin tower condominium with 2 basements and a swimming pool at 4th-floor podium

